DETERMINANT OF CONSTRUCTION PROJECT PERFORMANCE IN BIRNIN KEBBI

Main Article Content

Abdullahi Nuhu Jega
https://orcid.org/0000-0001-7459-8330
Umar Muhammad Birnin Kebbi
Usman Muhammad
Abdullateef Abdulkarim Jimoh

Abstract

Performance in building construction projects remains a vital issue all over the world; this is so because construction projects involve defined and clear objectives which must be met and several which need to be efficiently put to use. This study assessed the determinant of construction project performance. Primary data were obtained from Kebbi state Ministry of Works and Housing, Birnin Kebbi through a well-structured questionnaire in which 60 questionnaires were administered and 49 retrieved. Relative Importance Index (RII) and Mean Item Score (MIS) were employed for the analysis of data. The study found that the most important factor influencing performance of construction projects is improper planning and management (RII = 1.00). It was also discovered that the most significant effect of factors influencing performance on construction projects is total abandonment (MIS = 4.96). Having appropriate planning was found to be the most effective strategy for improving the performance of construction projects (MIS=4.94). It was concluded that the determinant factors of building construction project performance in Birnin Kebbi are significant.

Downloads

Download data is not yet available.

Article Details

How to Cite
Jega, N. A., Birnin Kebbi, U. M., Muhammad, U., & Jimoh, A. A. (2022). DETERMINANT OF CONSTRUCTION PROJECT PERFORMANCE IN BIRNIN KEBBI. African Journal of Environmental Sciences and Renewable Energy, 3(1), 31–38. Retrieved from https://publications.afropolitanjournals.com/index.php/ajesre/article/view/37
Section
Articles
Author Biographies

Abdullahi Nuhu Jega, Waziri Umaru Federal Polytechnic, Birnin Kebbi, Kebbi State.

Department of Quantity Surveying, Waziri Umaru Federal Polytechnic, Birnin Kebbi, Kebbi State - Nigeria.

Umar Muhammad Birnin Kebbi, Waziri Umaru Federal Polytechnic, Birnin Kebbi, Kebbi State.

Department of Quantity Surveying, Waziri Umaru Federal Polytechnic, Birnin Kebbi, Kebbi State - Nigeria.

Usman Muhammad, Waziri Umaru Federal Polytechnic, Birnin Kebbi, Kebbi State.

Department of Quantity Surveying, Waziri Umaru Federal Polytechnic, Birnin Kebbi, Kebbi State - Nigeria.

Abdullateef Abdulkarim Jimoh, Waziri Umaru Federal Polytechnic, Birnin Kebbi, Kebbi State.

Department of Quantity Surveying, Waziri Umaru Federal Polytechnic, Birnin Kebbi, Kebbi State - Nigeria.

References

Ali, Y. S. A., Mohamed, S. D. and Ali, A. A. (2019). Examination of Determinants of Project Performance in Construction Companies in Mogadishu. European Journal of Business and Management. 11(6). 26-32.

Anwar, W., Eduardo, M. H. and Mohammad K.K. (2019). Effects of varying factors on the performance of construction projects in terrorism hit areas of the world. African Journal of Business Management. Vol. 13(6), 188-197.

Babalola, I. H, Oluwatuyi, O. E, Akinloye, L. and Aiyewalehinmi, E. (2015). Factors Influencing the Performance of Construction Projects in Akure, Nigeria. International Journal of Civil Engineering, Construction and Estate Management 3 (4): 57-67.

Ghanim, A. B. (2017). Factors Affecting Performance of Construction Projects in Unstable Political and Economic Situations. ARPN Journal of Engineering and Applied Sciences. 12(19). 5384-5395.

Helen, I. B. and Oyewale, J. O. (2016). An Investigation into Factors Affecting the Performance of Public Construction Projects in Ondo State, Southwestern, Nigeria. Civil and Environmental Research. 8(1). 72-79.

Isah, A. M. (2019). Effect of Cash Flow on contractors’ Performance in Building Construction Projects in Niger State. An Unpublished B.Tech thesis submitted to the Department of Quantity Surveying, Federal University of Technology Minna.

Melba, A., Dhanya, R. and Ganapathy R. (2015). Study and Analysis of Factors Affecting the Performance of the Construction Projects. International Journal of Science, Engineering and Technology Research (IJSETR) 4(4). 1086-1091.

Nipin, J. B. (2015). Factors Affecting Success of Construction Project. Journal of Mechanical and Civil Engineering (IOSR-JMCE) 12(2). 17-26.

Oladipo, F. O, Fatuki A. M. and Aluko A. T. (2015). An Assessment of Major Factors Affecting Construction, Project Cost in Nigeria. International Journal of Sciences: Basic and Applied Research (IJSBAR) 24(4): 308-318.

Olanipekun, E. A, Nunayon, S. S. and Olugboyega, O. (2017). Factors Affecting Contractors’ Performance in Construction Project Delivery in Akure, Ondo State Nigeria. Journal of Knowledge Management, Economics and Information Technology. 7(4).

Oyedele, L. (2013). Avoiding performance failure payment deductions in PFI/PPP projects: Model of critical success factors. Journal of Performance of Constructed Facilities, 27 (3). 283-294.

Peter, O. N. and Evelyn, D. (2015). Factors Affecting the Performance of Construction Projects: A Survey of Construction Projects in the Coastal Region of Kenya. International Journal of Scientific and Research Publications, 5(10).

Rhumbix, (2018). Improve Productivity at Work in the Construction Industry. 1169 Howard Street, San Francisco, CA 94103 | +1 (855) RHUMBIX | info@rhumbix.com.

Saraf, D.D. (2013). Study of Factors Affecting Performance of Construction Project; International Journal of Science and Research (IJSR) ISSN (Online Index Copernicus Value Impact Factor, 14(5), 2319-7064.

Shittu, A. A., Ibrahim, A. D., Ibrahim, Y. M. and Adogbo, K. J. (2015). Assessment of Level of Implementation of Health and Safety Requirement in Construction Projects Execution by Small Firms in Abuja. In D. R. Ogunsemi, O. A. Awodele and A. E. Oke (Eds). Proceeding of the 2nd Nigerian Institute of Quantity Surveyors Research Conference (RECON2). Federal University of Technology, Akure. 1st – 3rd September. 467 – 482.